This project consisted
of the renovation of a 5-story, 81,300 sq. ft.
building that was built in the mid 1970s to
house soldiers. The contract included a large
amount of mold, asbestos and lead paint abatement,
100% interior demolition, 100% interior build-out
providing all new finishes (including the removal
of a 30' x 50' portion of the existing concrete
roof structure to allow for a vaulted ceiling
at the commanders' conference room), all new
MEP systems including emergency generator, replacing
all existing windows, the addition of a front
entrance and mechanical rooms, the construction
of new loading docks, and 3 separate parking
areas. The building and site had to be brought
up to current ATFP requirements which included
the structural reinforcing of existing walls
and construction of earthen berms around the
building perimeter. |